发表于2025-05-10
系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质必需的证书,是历年软考报名中的热点。
系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生的噩梦和难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,计算题的对错将决定考试成败。
全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题。
书中系统、详细地解析了这些复杂计算题,详细到每个步骤,同时配有考点回顾和计算公式等相关内容,一切为了考生和读者能够真正吃透计算题。
考生读懂本书后,可以透彻地掌握考试涉及的所有计算类考点,并能清晰理解考试的命题规律与命题思路,可以大幅提高考试的通过率。
系统集成项目管理工程师考试是全国计算机技术与软件专业资格(水平)考试的中级职称考试,也是企业评定系统集成资质所必需的证书,是历年软考报名中的热点。
古人云,得中原者得天下;现下有,得计算题者得软考。系统集成项目管理工程师考试中涉及大量的计算题,是考试的重点也是众多考生难以克服的难点,尤其是下午案例分析中的进度和成本计算题,在软考必须一次考试通过全部科目的背景下,其重要性可以称之为“一题做错,考试全砸!”。
本书全面覆盖了自2009年上半年至2015年下半年共14次考试中的全部计算类试题(包括上午选择题和下午案例题),系统、详细地逐题解析了这些复杂计算题,并配有考点回顾和计算公式,一切为考生和读者能够真正吃透计算题服务。
参加考试的考生,认真读懂本书的内容后,可以透彻地掌握考试涉及的所有计算类考点,可以清晰理解考试的命题规律、命题思路,可以大幅提高考试的通过率。
第1章 进度管理计算题 ······································································1
1.1 单代号网络图 ················································································1
1.1.1 知识点回顾 ·····················································································1
1.1.2 历年试题解析 ··················································································2
1.2 双代号网络图 ················································································4
1.2.1 知识点回顾 ·····················································································4
1.2.2 历年试题解析 ··················································································5
1.3 关键路径法 ···················································································6
1.3.1 知识点回顾 ·····················································································6
1.3.2 历年试题解析 ··················································································8
1.4 进度压缩 ·····················································································14
1.4.1 知识点回顾 ···················································································14
1.4.2 历年试题解析 ················································································14
1.5 资源优化 ·····················································································18
1.5.1 知识点回顾 ···················································································18
1.5.2 历年试题解析 ················································································19
1.6 PERT估算 ···················································································22
1.6.1 知识点回顾 ···················································································22
1.6.2 历年试题解析 ················································································23
1.7 进度估算 ·····················································································28
1.7.1 知识点回顾 ···················································································28
1.7.2 历年试题解析 ················································································28
1.8 进度综合案例 ···············································································33
1.8.1 (2009上半年,下午)试题二···························································33
1.8.2 (2011下半年,下午)试题二 ···························································35
1.8.3 (2013上半年,下午)试题二···························································37
·VI·
第2章成本管理计算题 ···································································· 40
2.1 成本类型 ·····················································································40
2.1.1 知识点回顾 ··················································································· 40
2.1.2 历年试题解析 ················································································ 40
2.2 成本估算 ·····················································································45
2.2.1 知识点回顾 ··················································································· 45
2.2.2 历年试题解析 ················································································ 46
2.3 成本预算 ·····················································································50
2.3.1 知识点回顾 ··················································································· 50
2.3.2 历年试题解析 ················································································ 51
2.4 挣值管理 ·····················································································55
2.4.1 知识点回顾 ··················································································· 55
2.4.2 历年试题解析 ················································································ 59
2.5 成本预测 ·····················································································68
2.5.1 知识点回顾 ··················································································· 68
2.5.2 历年试题解析 ················································································ 69
2.6 成本综合案例 ···············································································72
2.6.1 (2009下半年,下午)试题四··························································· 73
2.6.2 (2010上半年,下午)试题二··························································· 74
2.6.3 (2010下半年,下午)试题二 ·························································· 75
2.6.4 (2011 上半年,下午)试题二 ··························································· 77
2.6.5 (2012下半年,下午)试题三··························································· 79
2.6.6 (2013下半年,下午)试题四··························································· 85
2.6.7 (2014上半年,下午)试题四··························································· 87
第3章进度成本综合案例题 ······························································ 89
3.1 (2012上半年,下午)试题二 ··························································89
3.2 (2014下半年,下午)试题一 ··························································92
3.3 (2015上半年,下午)试题一 ··························································94
3.4 (2015下半年,下午)试题四 ··························································98
·VII·
第4章风险管理计算题 ···································································103
第5章招标采购计算题 ···································································108
5.1 历年试题解析 ············································································· 108
5.2 综合案例 ··················································································· 120
5.2.1 (2009下半年,下午)试题一··························································120
5.2.2 (2013下半年,下午)试题二··························································122
5.2.3 (2015下半年,下午)试题一··························································123
第6章立项管理计算题 ···································································125
第7章信息技术计算题 ···································································129
第8章集成资质计算题 ···································································139
系统集成项目管理工程师计算类试题真题详解 下载 mobi pdf epub txt 电子书 格式 2025
系统集成项目管理工程师计算类试题真题详解 下载 mobi epub pdf 电子书正在备考中,书本质量不错,印刷很清晰
评分系统集成项目管理工程师考试大纲·第2版/全国计算机技术与软件专业技术资格 水平 考试指定用书 不是当日到的,两天才到。
评分看上这款宝贝已经很久了,终于到手了,挑来挑去挑了这家,事实证明我的眼光还是很好的哟,没有 让我失望,做工和质量都很好,发货快,物流快
评分哈哈哈,真的是还不错啦,我觉得挺好的,不得好好夸上一夸,因为这样才能满20个字。
评分无可厚非,这是一本正版书。但是我不满意的是,更像二手货,全部卷边,我花了*块,尊重了你版权和商品。可是好像你们店家并不尊重我。快递的袋子也有破损!我需要一个解释!
评分经常京东网购,总有大量的包裹收,感觉写评语花掉了我大量的时间和精力! 所以在一段时间里,我总是不去评价 或者随便写写! 但是,我又总是觉得好像有点对不住那些辛苦工作的卖家客服、仓管、老板。 于是我写下了一小段话,给我觉得能拿到我五星好评的卖家的宝贝评价里面以示感谢和尊敬! 首先,宝贝是 性价比很高的,我每次都会先试用再评价的,虽然宝贝不一定是最好的,但在同等的价位里面绝对是表现最棒的。 京东的配送绝对是一流的,送货速度快,配送员服务态度好,每样东西都是送货上门。 希望京东能再接再厉, 做得更大更强。
评分还没有开始看,放弃5月份的了……
评分昨天下单,24h到手,物流快!书的质量还行,希望有帮助~~
评分正版书籍,印刷清晰。快递包装很好,放心购买。祝大家考试顺利通过!
系统集成项目管理工程师计算类试题真题详解 mobi epub pdf txt 电子书 格式下载 2025